SHARQTEHENERGOTA’MIR JV LLC
Modernization of Syrdarya TPP, repair of combined-cycle and gas turbine plants, high-voltage circuit breakers and power transformers.
- 2014–2021: modernization of eight units at Syrdarya TPP: installed capacity up by 200 MW, available capacity up by 500 MW, specific fuel consumption reduced to 320 g/kWh.
- Since 2016: repair of combined-cycle and gas turbine plants; all types of repairs of M701F4 gas turbines at Talimarjan, Navoi and Turakurgan are done with supervising personnel of MHPS TA (Mitsubishi).
- Repair of high-voltage circuit breakers up to 500 kV, power transformers up to 1,000,000 kVA with oil degassing and 6 kV draught equipment motors.